Skip to content
CENTRAL SAANICH · L-1A FIELD GUIDE

What if the provider ends the contract during preparation?

Sources checked:

THE DIRECT ANSWER

Review the effect on the applicant’s workload and the supported US role.

Replace assumptions with the actual arrangement

Identify genuine replacement support and timing if available. An expired contract should not remain the basis for a claim that operational work is covered.

Build the schedule from evidentiary milestones rather than a hoped-for launch date. First confirm the ownership link and the one-year continuous foreign employment period, then obtain current operational records and finalize the US job structure. For a new office, premises, funding, and a credible path to a qualifying managerial or executive role must exist before the first-year approval period can be evaluated. A later hire cannot retroactively prove what the role was at filing. Track expiring contracts, payroll dates, corporate changes, and the end of any current status, because each can change what records are available. The L-1A maximum is generally seven years, so long-range staffing choices can matter even when the initial assignment is short. Hypothetical example: an industrial-laundry company plans to transfer its plant manager after a US lease begins in June. The signed lease is delayed until August, yet the draft petition still says premises are secured. The responsible sequence is to update the evidence, confirm the manager’s Canadian payroll year remains within the relevant window, and file on the facts that exist, rather than preserving a June timeline that no longer matches the record.